Steel Structure Erection

Erection of pre-engineered buildings and steel structure is the last step in our building process that all the components from the previous steps come together.

steel-structure-erection

Build column combing with purlins (if any), brace column together. Then, continue building rafters after adjusting column. Install the inside truss frames, and then proceed to erect the outside ones (according to the movement of truck crane – see the enclosed construction drawing) Begin erecting from the braced bay. Settle two construction frames at the braced position before placing new frame. This process is translated for the next frame. Have to have temporary brace during the erection process. Use purlins with the bracing cable to locate, and link all the rafter frames. Erect steel panel after adjusting rafter frame and straight purlin, clean up, and paint all scratches on the rafter and purlin. Use chalks or stretch attached wires to locate or mark axis positions in order to balance the steel panel when to complete the covering. Set foot on the bottom waves when walking on the roof. Steel panel may be crashed if stepping on the high waves, which can cause deformation or leaking. Do not walk on bright panels.

More Than 25 Years Of Experience

Get In Touch

Innovative Concept

Design Of Steel Structure

Supply Steel Structure

Project Management

Leading Provider Of Construction Service

Our design and engineering team is trained to handle these complex software enabling them to design complex custom designed building structures. Our design and engineering team and our in house capabilities enable us to have strong built on knowledge of our experienced personnel.